2018-08-032018-08-031985-03-01http://hdl.handle.net/2152.3/9743NASA Mission Operations Directorate Post Insertion Procedures for STS-51BNASAMission Operations DirectorateSTS-51Btechnical drawingDr. William Thorntonwaste collection systemWCSPost Insertion ProceduresWCS_1_Mission_Operations_Directorate_03.01.85